{"id":1134,"date":"2022-01-17T14:40:11","date_gmt":"2022-01-17T12:40:11","guid":{"rendered":"https:\/\/ege-windturbines.com\/en\/?p=1134"},"modified":"2022-01-17T14:40:14","modified_gmt":"2022-01-17T12:40:14","slug":"orsted-launches-probe-after-offshore-wind-turbine-tilts","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2022\/01\/17\/orsted-launches-probe-after-offshore-wind-turbine-tilts\/","title":{"rendered":"\u00d8rsted Launches probe After Offshore Wind Turbine Tilts"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221;][et_pb_column _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221; type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p>\u00d8rsted has launched an investigation after one of the turbines and its foundation at the\u00a0<span class=\"popover__wrapper\"><a class=\"popover__title\" href=\"https:\/\/www.windpowermonthly.com\/intelligence\/fa6ad588-5172-97ba-81c9-29ea02d13d4a\">165.6MW Nysted (R\u00f8dsand 1)<\/a><small><\/small><\/span>\u00a0offshore wind farm tilted.<\/p>\n<p>The Siemens Gamesa SWT-2.3-82 turbine titled late on Wednesday (12 January) afternoon, the Danish developer confirmed.<\/p>\n<p>Nysted is installed in the Baltic Sea, 10km from the shore of the south-east Danish island of Lolland.<\/p>\n<p>\u00d8rsted informed the Danish maritime authority about the incident. The authority has issued a warning to vessels in the waters to keep a safe distance.<\/p>\n<div id=\"advertCentre\">\n<div id=\"c501Ad\" class=\"commercialSlot\" data-location-code=\"C\" data-sizes=\"300x250\" data-google-query-id=\"CIeq5JHmuPUCFZiYdwod4FcBTA\">\n<div id=\"google_ads_iframe_\/5748\/wpw.main\/page\/news\/article_5__container__\"><iframe id=\"google_ads_iframe_\/5748\/wpw.main\/page\/news\/article_5\" tabindex=\"0\" title=\"3rd party ad content\" role=\"region\" name=\"google_ads_iframe_\/5748\/wpw.main\/page\/news\/article_5\" width=\"1\" height=\"1\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" aria-label=\"Advertisement\" data-google-container-id=\"6\" data-load-complete=\"true\" data-mce-fragment=\"1\"><\/iframe><\/div>\n<\/div>\n<\/div>\n<p>No one was injured during the incident, and power consumers on Lolland have not been impacted, \u00d8rsted stated.<\/p>\n<p>The developer is investigating what caused the turbine to tilt.<\/p>\n<p>Nysted was commissioned in 2003 and its 72 turbines are installed on gravity-based foundations, which use ballast to moor turbines to the seabed. It is the only one of \u00d8rsted\u2019s wind farms to use this foundation type.<\/p>\n<p><a href=\"https:\/\/www.windpowermonthly.com\/article\/1737531\/orsted-launches-probe-offshore-wind-turbine-tilts\">https:\/\/www.windpowermonthly.com\/article\/1737531\/orsted-launches-probe-offshore-wind-turbine-tilts<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221;][et_pb_row _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221;][et_pb_column _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221; type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;4.6.6&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;] \u00d8rsted has launched an investigation after one of the turbines and its foundation at the\u00a0165.6MW Nysted (R\u00f8dsand 1)\u00a0offshore wind farm tilted. The Siemens Gamesa SWT-2.3-82 turbine titled late on Wednesday (12 January) afternoon, the Danish developer confirmed. Nysted is installed in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1137,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/1134"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=1134"}],"version-history":[{"count":2,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/1134\/revisions"}],"predecessor-version":[{"id":1138,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/1134\/revisions\/1138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/1137"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=1134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=1134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=1134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}