{"id":475,"date":"2018-01-17T16:37:17","date_gmt":"2018-01-17T14:37:17","guid":{"rendered":"http:\/\/ege-windturbines.com\/en\/?p=475"},"modified":"2018-01-17T16:37:17","modified_gmt":"2018-01-17T14:37:17","slug":"ppc-renewables-aiming-for-development-of-700-mw-in-2018-19","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2018\/01\/17\/ppc-renewables-aiming-for-development-of-700-mw-in-2018-19\/","title":{"rendered":"PPC Renewables Aiming For Development Of 700 MW In 2018-19"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;]<\/p>\n<p>Looking forward to RES auctions scheduled for this coming April, PPC Renewables aims to\u00a0develop\u00a0700 MW in RES capacity over the next two years, primarily in the wind and photovoltaic energy domains.<\/p>\n<p>PPC Renewables intends\u00a0to begin with 18 wind and small hydropower projects totaling 90 MW and budgeted at 114 million euros. Their\u00a0financing was secured just weeks ago by the European Invetsment Bank.<\/p>\n<p>PPC Renewables will be taking\u00a0part in the energy ministry\u2019s upcoming RES auctions backed\u00a0by a strong portfolio comprised of wind and photovoltaic projects in various parts of Greece. These include 30 MW in Karditsa, 10 MW in Kefalonia and 4.5 MW in Tinos.<\/p>\n<p>PPC Renewables is also currently examining buying stakes in existing licenses, locally and\u00a0especially abroad, to develop projects with partners. Albania, Kosovo and Ukraine appear to be the foreign markets being targeted\u00a0for projects with capacities ranging between 1 and 2 MW to begin with. The EBRD and World Bank, financing green projects in developing markets, appear likely to participate in these investments.<\/p>\n<p>Besides its plans to develop mature projects, PPC Renewables is also considering working on projects of medium maturity, for completion\u00a0by 2020. These projects, which include investments in the wind, geothermal and biomass sectors, possess a total capacity of 244 MW and are budgeted at 430 million euros in total.<\/p>\n<p>PPC Renewables is also in the process of gaining a license for a 200-MW photovoltaic project budgeted at 160 million euros, which the firm expects to develop by 2020.<\/p>\n<p>The firm is also planning to develop geothermal facilities on the island Santorini as joint projects with the local municipality. A tender staged by PPC Renewables in search of a strategic partner to co-develop geothermal fields in Methana, Lesvos, Nisyros, Milos, Kimolos and Polyaigos is currently in progress. Six participants face an end-of-January deadline to submit their binding offers. PPC Renewables is expected to have named its strategic partner by March.<\/p>\n<p>Ilias Monaholias, the head official at PPC Renewables, admitted feeling perplexed by a concern over geothermal development expressed on the islands Nisyros and Milos. \u201cIt is difficult for me to understand why other islands fear geothermal development when Santorini does not,\u201d Monaholias remarked.<\/p>\n<p><a href=\"https:\/\/energypress.eu\/ppc-renewables-anticipating-res-auctions-aiming-development-700-mw-2018-19\/\">https:\/\/energypress.eu\/ppc-renewables-anticipating-res-auctions-aiming-development-700-mw-2018-19\/<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;] Looking forward to RES auctions scheduled for this coming April, PPC Renewables aims to\u00a0develop\u00a0700 MW in RES capacity over the next two years, primarily in the wind and photovoltaic energy domains. PPC Renewables intends\u00a0to begin with 18 wind and small hydropower projects totaling 90 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/475"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=475"}],"version-history":[{"count":1,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/475\/revisions"}],"predecessor-version":[{"id":477,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/475\/revisions\/477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/476"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}