{"id":588,"date":"2018-10-08T11:49:02","date_gmt":"2018-10-08T08:49:02","guid":{"rendered":"http:\/\/ege-windturbines.com\/en\/?p=588"},"modified":"2018-10-08T11:49:02","modified_gmt":"2018-10-08T08:49:02","slug":"siemens-gamesa-wins-first-russian-order","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2018\/10\/08\/siemens-gamesa-wins-first-russian-order\/","title":{"rendered":"Siemens Gamesa wins First Russian Order"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;]<\/p>\n<p>RUSSIA: Siemens Gamesa will supply 26 turbines to Enel&#8217;s Russian subsidiary for a 90MW project &#8212; the manufacturer&#8217;s first order in the country.<\/p>\n<p>It will provide Enel Russia with its SG 3.4-132 turbines for the 90MW Azovskaya wind farm in south-western Russia.<\/p>\n<p>The order builds on a preliminary agreement the two companies signed in 2017 for 291MW of turbines to be supplied at two Russian wind farms. Enel had won the capacity in a tender\u00a0<a href=\"http:\/\/www.windpowermonthly.com\/article\/1436585\/enel-enters-russia-fortum-dominates-auction\">in June<\/a>\u00a0of that year.<\/p>\n<p>Part of the turbine components will be locally procured and assembled in accordance with Russia\u2019s localisation requirements, Siemens Gamesa stated.<\/p>\n<p>Russian wind farms must include 65% local content, and 44% of turbine materials must be sourced locally, according to the Russian Association of the Wind Power Industry (RAWI).<\/p>\n<p>Siemens Gamesa is one of several manufacturers setting up production facilities in\u00a0<a href=\"https:\/\/www.windpowermonthly.com\/russia\">Russia<\/a>.<\/p>\n<p>It signed a cooperation agreement with Siemens Gas Turbine Technologies to assemble wind turbine nacelles in the outskirts of St Petersburg\u00a0<a href=\"http:\/\/www.windpowermonthly.com\/article\/1491971\/sgre-build-turbines-russia\">in September<\/a>.<\/p>\n<p>Turbines are due to be delivered and installed at Azovskaya in 2020, and the project is due to be commissioned that same year.<\/p>\n<p><a href=\"https:\/\/www.windpowermonthly.com\/article\/1495161\/siemens-gamesa-wins-first-russian-order\">https:\/\/www.windpowermonthly.com\/article\/1495161\/siemens-gamesa-wins-first-russian-order<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;] RUSSIA: Siemens Gamesa will supply 26 turbines to Enel&#8217;s Russian subsidiary for a 90MW project &#8212; the manufacturer&#8217;s first order in the country. It will provide Enel Russia with its SG 3.4-132 turbines for the 90MW Azovskaya wind farm in south-western Russia. The order builds [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":589,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/588"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=588"}],"version-history":[{"count":1,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/588\/revisions"}],"predecessor-version":[{"id":590,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/588\/revisions\/590"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/589"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}