{"id":595,"date":"2018-10-22T11:35:44","date_gmt":"2018-10-22T08:35:44","guid":{"rendered":"http:\/\/ege-windturbines.com\/en\/?p=595"},"modified":"2018-10-22T11:35:44","modified_gmt":"2018-10-22T08:35:44","slug":"vestas-to-supply-enel-in-south-africa","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2018\/10\/22\/vestas-to-supply-enel-in-south-africa\/","title":{"rendered":"Vestas to supply Enel in South Africa"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;]<\/p>\n<p>SOUTH AFRICA: Vestas will provide Enel Green Power with 70 V136-4.2MW turbines at two projects won in the country&#8217;s fourth tender round.<\/p>\n<p>The Karusa and Soetwater projects are both 147MW and located in the Western Cape. They will each feature 35 turbines with hub heights of 82 metres.<\/p>\n<p>Vestas will supply, install and commission the 70 turbines with a combined capacity of 294MW. It will also service the two sites for five years.<\/p>\n<p>Nils de Baar, president of Vestas Northern and Central Europe, added the company was &#8220;procuring locally produced towers and contracting local transport companies&#8221; as part of the manufacturing and installation process.<\/p>\n<p>To lower turbine downtime and levelised cost of energy (LCOE), the projects will also include a Scada solution (supervisory control and data acquisition), the manufacturer stated.<\/p>\n<p>Turbine delivery and installation is planned for the second half of 2020. Both projects are expected to be operational in the second half of 2021.<\/p>\n<p>Enel was\u00a0<a href=\"http:\/\/www.windpowermonthly.com\/article\/1342664\/enel-secures-south-africa-deals-worth-425mw\">awarded capacity<\/a>\u00a0for the Karusa and Soetwater projects in the fourth tender round under\u00a0<a href=\"https:\/\/www.windpowermonthly.com\/south-africa\">South Africa<\/a>\u2019s renewables procurement plan (REIPP) April 2015.<\/p>\n<p>However, state utility Eskom did not\u00a0<a href=\"http:\/\/www.windpowermonthly.com\/article\/1461150\/long-delayed-south-african-power-deals-signed\">sign power purchase agreements (PPAs)<\/a>\u00a0for the two wind farms \u2014 and for 25 other renewable energy projects \u2014 until April 2018.<\/p>\n<p><a href=\"https:\/\/www.windpowermonthly.com\/article\/1496679\/vestas-supply-enel-south-africa\">https:\/\/www.windpowermonthly.com\/article\/1496679\/vestas-supply-enel-south-africa<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;] SOUTH AFRICA: Vestas will provide Enel Green Power with 70 V136-4.2MW turbines at two projects won in the country&#8217;s fourth tender round. The Karusa and Soetwater projects are both 147MW and located in the Western Cape. They will each feature 35 turbines with hub heights [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":596,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/595"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=595"}],"version-history":[{"count":1,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/595\/revisions"}],"predecessor-version":[{"id":597,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/595\/revisions\/597"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/596"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}