{"id":654,"date":"2019-02-04T12:00:35","date_gmt":"2019-02-04T10:00:35","guid":{"rendered":"http:\/\/ege-windturbines.com\/en\/?p=654"},"modified":"2019-02-04T12:00:35","modified_gmt":"2019-02-04T10:00:35","slug":"wind-turbine-of-the-year-2018-3mw-nordex-n149","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2019\/02\/04\/wind-turbine-of-the-year-2018-3mw-nordex-n149\/","title":{"rendered":"Wind Turbine of the Year 2018 &#8211; 3MW+: Nordex N149"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;]<\/p>\n<p>SPONSORED CONTENT. Why did Nordex&#8217;s N149 win Best Onshore Turbine 3MW+ category in the 2018 awards?<\/p>\n<p><em>Windpower Monthly\u2019s<\/em>\u00a0Shaun Campbell and David Weston discussed their decision to name Nordex\u2019s N149 turbine as the winner in the Best Onshore Turbine 3MW+ category in the 2018 awards.<\/p>\n<p>In August, less than a year after announcing its Delta4000 platform, the Nordex Group installed an N149\/4.0-4.5MW prototype, with a second following in November.<\/p>\n<p>This is a major achievement, which spearheads the competition in the race for new onshore turbines with supersize rotors.<\/p>\n<p>&#8220;The key thing about the turbine was that it was the first to market of this new wave of 4-5MW turbines with rotar diameters of up to 150m. Nordex has simply got there before everybody else&#8221; said Campbell.<\/p>\n<p>The varied locations of orders was also noted.<\/p>\n<p>&#8220;It\u2019s received orders everywhere from Finland to Turkey which have very different environments and wind regimes. That proves the flexibility [it has] within the market&#8221; said Weston.<\/p>\n<p>&#8220;Another key thing is that there\u2019s plenty of development potential with this turbine.<\/p>\n<p>&#8220;We know that Nordex is working on a 4.8MW version with a shorter roar diameter for high wind speeds which does suggest that there\u2019s going to be plenty to they do with it over the next few years,&#8221; concluded Campbell.<\/p>\n<p><a href=\"https:\/\/www.windpowermonthly.com\/article\/1524515\/wind-turbine-year-2018-3mw+-nordex-n149\">https:\/\/www.windpowermonthly.com\/article\/1524515\/wind-turbine-year-2018-3mw+-nordex-n149<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;] SPONSORED CONTENT. Why did Nordex&#8217;s N149 win Best Onshore Turbine 3MW+ category in the 2018 awards? Windpower Monthly\u2019s\u00a0Shaun Campbell and David Weston discussed their decision to name Nordex\u2019s N149 turbine as the winner in the Best Onshore Turbine 3MW+ category in the 2018 awards. In [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/654"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=654"}],"version-history":[{"count":1,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/654\/revisions"}],"predecessor-version":[{"id":656,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/654\/revisions\/656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/657"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}