{"id":693,"date":"2019-05-02T10:51:59","date_gmt":"2019-05-02T07:51:59","guid":{"rendered":"http:\/\/ege-windturbines.com\/en\/?p=693"},"modified":"2019-05-02T10:51:59","modified_gmt":"2019-05-02T07:51:59","slug":"siemens-gamesa-to-supply-43-wind-turbines-to-canadian-project","status":"publish","type":"post","link":"https:\/\/ege-windturbines.com\/en\/2019\/05\/02\/siemens-gamesa-to-supply-43-wind-turbines-to-canadian-project\/","title":{"rendered":"Siemens Gamesa to supply 43 Wind Turbines to Canadian Project"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;]<\/p>\n<p>Siemens Gamesa Renewable Energy signed a contract to supply and commission 43 SG 4.5-145 wind turbines, with flexible rating up to 4.8 MW, for a wind project in Canada with an undisclosed customer. The order is for a nominal capacity of 194 MW.<\/p>\n<p>The SG 4.5-145 will be the most powerful turbine with the largest rotor size to date in Canada. The 71-meter blade integrates aerodynamics and noise reduction features\u2014including Siemens Gamesa DinoTails Next Generation technology\u2014to guarantee a high production of energy and reduced noise emission levels.<\/p>\n<p>\u201cWe\u2019re proud that our partners chose Siemens Gamesa and our SG 4.5-145 turbine for this project,\u201d said David Hickey, head of the Siemens Gamesa business in Canada. \u201cThe new SG 4.5-145 turbine will provide extremely cost competitive and clean energy to the consumers and communities of Canada.\u201d<\/p>\n<p>With more than 3,000 MW installed in Canada, Siemens Gamesa Renewable Energy is the market leader by cumulative installed capacity. Our team of employees provide technical expertise, top-tier service, quality products, and ongoing support to all of our customers. Canada is 8th in the world for total onshore installed wind capacity with 12.8 GW as of December 2018, with a 20% annual growth rate for the last ten years.<a href=\"https:\/\/www.renewableenergyworld.com\/articles\/2019\/04\/siemens-gamesa-to-supply-43-wind-turbines-to-canadian-project.html\">https:\/\/www.renewableenergyworld.com\/articles\/2019\/04\/siemens-gamesa-to-supply-43-wind-turbines-to-canadian-project.html<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;justified&#8221; use_border_color=&#8221;off&#8221; border_color=&#8221;#ffffff&#8221; border_style=&#8221;solid&#8221;] Siemens Gamesa Renewable Energy signed a contract to supply and commission 43 SG 4.5-145 wind turbines, with flexible rating up to 4.8 MW, for a wind project in Canada with an undisclosed customer. The order is for a nominal capacity of 194 MW. The SG [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":694,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/693"}],"collection":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/comments?post=693"}],"version-history":[{"count":1,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/693\/revisions"}],"predecessor-version":[{"id":695,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/posts\/693\/revisions\/695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media\/694"}],"wp:attachment":[{"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/media?parent=693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/categories?post=693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ege-windturbines.com\/en\/wp-json\/wp\/v2\/tags?post=693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}